This is my build log, experiment, and way to share my project. I am building a Wittman W-10 Tailwind and want to share the experience with whoever finds these pages.
Sunday, May 24, 2009
Built two more ribs today. One is in the jig curing the other is sheeted on both sides with one of those sides curing. I did clean up the garage/build area today as well. I unrolled some vinyl flooring that a friend gave me that is light colored. I am hoping that will help the area be a little brighter. Dark concrete doesn't seem to reflect light very well. So far that is an improvement. Since the rib building is going at a pretty fast rate I went ahead and ordered the rest of the necessary wood from Aircraft Spruce today since last time it seemed to take about 3 1/2 weeks to get the order. I suspect that I will have all of the ribs built for the wing in that time frame. If not then it will be pretty close.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment